Valuations Valesco is multi functional and includes a seamless transition from estimating to post contract status. An essential tool for both the client and contractors QS, Valesco post-contract can be used independently or in conjunction with the estimating system (estimate data from other systems is readily imported by means of a text file or MS Windows Clipboard).

Valesco enables progress and performance monitoring to a far higher standard that can conventionally be achieved.

 › READ ON OR CLICK HERE FOR MORE INFORMATION

...just one of the Crest Construction Software products available to the Construction and Civil Engineering Industries...

Valesco Valuations

Screen View, Toolbars and Icons:
  • Familiar tree structure for rapid BoQ navigation
  • Alternative editable spreadsheet style view
  • Customisable screen view
  • Hot keys for rapid data entry
  • Reports can be displayed as screen views
  • Online help
BoQ Data Entry, Editing and Navigation
  • Import BoQ data from spreadsheet, ADCII or CITE file
  • User Valesco Estimating data import from other estimating software by ASCII or CITE file or using Windows Clipboard
  • Add new bill, page, elemental data with a single mouse click
  • Create BoQ from a commercially available database or your own library
  • Automatic cost coding from the library (schedule)
  • Create filters for navigation, summarisation, viewing or reporting
  • Create Tags to collect/step through similarly Tagged records
  • Cut, copy and paste BoQ or Resource data between concurrently loaded projects
  • Edit consistently and rapidly using the Bulk Field Change feature
  • Use customizable Grid View for keyboard entry or to Copy/Paste from other software
  • Highlight items individually, by range or by the use of a filter
  • Measure drawings on screen and record dims ad side calculations in an item spreadsheet
  • Record relevant information using the Notepad
Reports and Reporting
  • Create unlimited user defined BoQ or Resource based reports
  • Analysis tabular style reports using sorts with summarisation by sort key
  • Highlight (or show only) selected information using filters
  • Send any report via email
  • Analyse unbalancing effects with Expected, Best and Worst case Quantities
  • User Defined Variable to customise analysis calculations
  • Wastage as resource and/or operation specific
Interim and Final Measurement
  • Access tender notes and spreadsheet information
  • Claimed, paid , internal and estimated final quantities for previous, period, cumulative and remaining
  • Enter quantity, revenue, % of final estimate or % of BoQ quantity for selected items
  • Submit application (Claimed) quantities electronically and copy and paste amended (Paid) quantities
  • Export Application to spreadsheet and submit with hard copy of report
  • Paste ‘Paid’ quantities from returned spread sheet directly into Valesco
  • End of Period ‘Roll-over’ (previous quantity becomes Previous + Period quantity)
  • Evaluate Sub-Contract liabilities
  • Use Valesco estimating feature to insert and price variations anywhere within the valuation document
  • Measure non-BoQ Sub Items for internal value
Resource Assignment
  • Quantifiable Sub Items for BoQ item rates build up
  • Allow for a start-up cost with a ‘fixed’ Resource assignment
  • Apply resources to multiple items simultaneously
  • Copy and Paste resource/rate build ups between concurrently loaded projects
  • Export Sub-Contract enquiries to spreadsheet
  • Email the items that are to be priced
  • Import Sub-Contractors rates
  • Full audit trail of pricing
  • Quick and easy creation of resource rate libraries
  • Save rate build-ups to library for future use
  • Price from your own or any commercially available resource or rates libraries
  • Unlimited number of resources and/or resources sets (gang build –ups) per item
  • Click mouse once to access project resource file
  • Display/hide/rearrange resource assignment data
  • Duration and usage automatically calculated from the assignment date
  • Replace or re-price currently assigned resources
  • Additional items/Variation can be added at any position within the document

...continued

Resources
  • Define Costs Types (Labour, Plant etc) for Resources and Costs
  • Optionally specify complex resources to allow for fuel, transport etc
  • Import from a Spreadsheet
  • Create filters for navigation, summarisation, viewing or reporting
  • Define ‘Sets’ containing Resources and-or other Sets
  • Copy a priced item into the Resource library for re-use as a Set
Tags/Notes/Spreadsheets
  • Copy and past side calculations to similar items
  • Locate all items with notes or spread sheet information
  • Notepad and spreadsheet per BoQ item
  • Quick identification of Sub-Contract trades
  • Records dims and measurement information
  • Apply multiple Tags for any purpose e.g. Items that require further analysis
  • Sub-Contract items
Sub-Contractors
  • Assign one or more Sub-Contractor to selected BoQ Items by trade with a single mouse click
  • Allow for fix only, supply and fix, lump sum pricing
  • Distribute printed and/or electronic enquiry documents
  • Copy and Paste returned spreadsheet data into the BoQ for comparisons
  • Create a comparison sheet for each trade
  • Analyse Sub-Contractors mark-up bias
  • Retain non selected Sub-Contract data for future reference
  • Permanently retain your own pricing data for future reference
Suppliers
  • Print Resource usage and export to a spreadsheet for the enquiry documentation
  • Distribute printed and/or electronic enquiry documents
  • Add suppliers bid data to each resource
  • Use flexible report procedures to compare Supplier bids
  • Select the preferred Supplier
  • Retain all Suppliers data for future reference
Reports and Reporting
  • Create unlimited user defined BoQ or Resources based reports
  • Analysis tabular style reports using sorts with summarisation by sort key
  • Highlight (or show only) selected information using filters
  • Send any report via email
  • Analyse unbalancing effects with Expected, Best and Worst case Quantities
  • User Defined Variables to customise analysis calculations
  • Wastage as resource and-or operation specific
Advanced Features
  • Analyse and compensate for expected, best and worst quantities
  • Powerful bulk field change for rapid changes
  • Simulate operations start up costs in resource definitions
  • Update your works programme from monthly valuations with CS Project
  • Instant on-screen cost distribution with user specified statistical analysis
  • Adapt to different contracts with your own Text, Date and Numeric User Fields
  • Customise with user defined costs structure, calculations/formula
  • Easy interface to other software by ODBC, Clipboard or ASCII file
  • Set up for single user or as a client to Access, SQL Server or Oracle
  • Protect confidentiality by controlling access to specified data
System Requirements
  • Windows NT/2000, XP or Vista
  • Minimum 128 MB of RAM recommended
  • Hard disk with approximately 100MB free disk space
  • Can be installed on workstations or network servers
  • Any printer or plotter supported by MS Windows

Crest Software: Product Information Enquiry

Please complete the form and click 'Send Request'

Your information:

NAME:*
COMPANY:*
ADDRESS:*
POSTCODE:*
EMAIL:* Confirmation will be sent here
CONTACT No:*

Required Product Information:

 ›  Valesco Estimating
 ›  Valesco Valuations
 ›  CS Project Planning
 ›  CrestDOCS Drawing & Document control
 ›  I would like a presentation
COMMENTS:
* Mandatory information please
All information provided in the above form will be kept private and not disclosed to any third-party.